{"id":9974,"date":"2022-06-24T01:04:02","date_gmt":"2022-06-23T23:04:02","guid":{"rendered":"https:\/\/www.rodiosbo.com\/offer-portfolio\/talud-el-florido\/"},"modified":"2022-06-24T01:28:48","modified_gmt":"2022-06-23T23:28:48","slug":"talud-el-florido","status":"publish","type":"avada_portfolio","link":"https:\/\/www.rodiosbo.com\/en\/offer-portfolio\/talud-el-florido\/","title":{"rendered":"El Florido Slope"},"content":{"rendered":"

Project Description<\/span><\/strong><\/div><\/h2><\/div>

Located in Honduran territory on the CA-11 international highway, slope stabilization was required through the use of active anchors in addition to shotcrete and sub-horizontal drains.<\/span><\/p>\n<\/div>

<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>

Solution<\/span><\/strong><\/div><\/h2><\/div>

The solutions provided in this project were necessary to stabilize the slopes of the road section due to a geological fault in the area.<\/span><\/p>\n<\/div><\/div><\/div>

<\/div><\/div><\/div>

Client:<\/b><\/span>
\nConsorcio Cop\u00e1n<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Country:<\/span><\/span><\/span> <\/b><\/p>\n

Honduras<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Start Date:<\/span><\/b><\/p>\n

Febrero 2020<\/span><\/b><\/p>\n

End Date:<\/span><\/span><\/b><\/span><\/p>\n

Junio 2021<\/span><\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Amounts of Work: <\/span><\/b><\/span>
\n1,105 m<\/span>2<\/span><\/sup><\/span><\/span> of shotcrete.<\/span><\/span><\/span><\/b><\/p>\n

3,694 lm<\/span><\/span><\/span> of active anchors.<\/span><\/span><\/span><\/b><\/p>\n

188 u<\/span><\/span> of subhorizontal drains.<\/span><\/span><\/span><\/b><\/p>\n<\/div><\/div><\/div>

<\/div><\/div><\/div><\/div><\/div>