{"id":9911,"date":"2022-06-09T20:25:27","date_gmt":"2022-06-09T18:25:27","guid":{"rendered":"https:\/\/www.rodiosbo.com\/?post_type=avada_portfolio&p=9911"},"modified":"2022-06-09T20:25:27","modified_gmt":"2022-06-09T18:25:27","slug":"hydroelectric-power-plant-el-chaparral","status":"publish","type":"avada_portfolio","link":"https:\/\/www.rodiosbo.com\/en\/offer-portfolio\/hydroelectric-power-plant-el-chaparral\/","title":{"rendered":"Hydroelectric Power Plant El Chaparral"},"content":{"rendered":"
El Chaparral hydroelectric project is located in the northwestern part of El Salvador, which is one of the hydroelectric plants owned by CEL (Electric Commission of El R\u00edo Lempa), the salvadoran energy company. The project began studies in the 2000s and to date is in the final phase of construction and equipment. Rodio Swissboring El Salvador, as a company established in the country for more than 60 years, was contracted directly for the completion of specialized works for the hydroelectric plant.<\/span><\/p>\n<\/div> Solution<\/span><\/strong><\/p><\/h2><\/div> The main activities of the project consisted of:<\/span><\/p>\n Client:<\/b><\/span> Country:<\/span><\/span><\/span> <\/b><\/p>\n El Salvador<\/span><\/b><\/p>\n<\/div> Start Date:<\/span><\/b><\/p>\n December 2020<\/span><\/b><\/p>\n End Date:<\/span><\/span><\/b><\/span><\/p>\n June 2022<\/span><\/span><\/b><\/p>\n<\/div> Amounts of Work: <\/span><\/b><\/span> 9,500 m2<\/sup><\/span><\/span> of 800mm Slurry Walls.<\/span><\/span><\/span><\/b><\/p>\n 160,000 m3<\/sup><\/span><\/span> of Earthworks – Slurry Wall.<\/span><\/span><\/span><\/b><\/p>\n 12,500 m2<\/sup><\/span><\/span> of Geomembrane – Loading Chamber.<\/span><\/span><\/span><\/b><\/p>\n<\/div><\/div><\/div>\n
\nCEL (Comisi\u00f3n El\u00e9ctrica de El R\u00edo Lempa)<\/span><\/b><\/p>\n<\/div>
\n30,000 ml<\/span><\/span> of grouting – Grouting and Vertical Drains.<\/span><\/span><\/span><\/b><\/p>\n