{"id":9224,"date":"2021-07-07T23:25:08","date_gmt":"2021-07-07T21:25:08","guid":{"rendered":"https:\/\/www.rodiosbo.com\/?post_type=avada_portfolio&p=9224"},"modified":"2021-07-09T03:11:55","modified_gmt":"2021-07-09T01:11:55","slug":"san-gabriel-plant-piles","status":"publish","type":"avada_portfolio","link":"https:\/\/www.rodiosbo.com\/en\/offer-portfolio\/san-gabriel-plant-piles\/","title":{"rendered":"San Gabriel Plant Piles"},"content":{"rendered":"
The work consisted of the construction of piles to cement eleven buildings and \/ or platforms of the new Cementos Progreso plant.<\/span><\/p>\n<\/div> The deep foundation of the new plant consisted of 552 1,000mm diameter piles with different drilling lengths, the deepest pile being 38.50m, for a total of 15,560.00 ml of drilling.<\/span><\/p>\n<\/div><\/div><\/div> Client:<\/span> Country:<\/span><\/span><\/span> <\/b><\/p>\n Guatemala<\/span><\/b><\/p>\n<\/div> Start Date:<\/span><\/b><\/p>\n November 2013<\/span><\/b><\/p>\n End Date:<\/span><\/span><\/b><\/span><\/p>\n April 2014<\/span><\/span><\/b><\/p>\n<\/div> Amounts of work: <\/span><\/b><\/span>
\nPolysius Progrefa – ThyssenKrupp<\/span><\/b><\/p>\n<\/div>
\n15,560 ml of 1,000 mm Rotary Piles.<\/span><\/span><\/span><\/b><\/p>\n<\/div><\/div><\/div>