{"id":9222,"date":"2021-07-07T23:24:57","date_gmt":"2021-07-07T21:24:57","guid":{"rendered":"https:\/\/www.rodiosbo.com\/?post_type=avada_portfolio&p=9222"},"modified":"2022-05-10T19:33:59","modified_gmt":"2022-05-10T17:33:59","slug":"cosiguina-geothermal-project","status":"publish","type":"avada_portfolio","link":"https:\/\/www.rodiosbo.com\/en\/offer-portfolio\/cosiguina-geothermal-project\/","title":{"rendered":"Cosiguina Geothermal Project"},"content":{"rendered":"
In La Libertad Mine we have carried out different campaigns from its initial development to during the 90’s. In this last campaign, drilling was carried out with different tracked equipment and Man Portable equipment. <\/span><\/p>\n<\/div> Core recovery drilling using diamond drilling crowns and wireline system. <\/span><\/p>\n<\/div><\/div><\/div> Client:<\/b><\/span> Country:<\/span><\/span><\/span> <\/b><\/p>\n Nicaragua<\/span><\/b><\/p>\n<\/div> Start Date:<\/span><\/b><\/p>\n June 2020<\/span><\/b><\/p>\n End Date:<\/span><\/span><\/b><\/span><\/p>\n December 2020<\/span><\/span><\/b><\/p>\n<\/div> Amounts of work: <\/span><\/b><\/span>
\nCalibre Mining Corp.<\/span><\/b><\/p>\n<\/div>
\n5,000 ml of drilling<\/span><\/span>.<\/span><\/span><\/span><\/b><\/p>\n<\/div><\/div><\/div>