{"id":9220,"date":"2021-07-07T23:24:48","date_gmt":"2021-07-07T21:24:48","guid":{"rendered":"https:\/\/www.rodiosbo.com\/?post_type=avada_portfolio&p=9220"},"modified":"2021-07-10T00:31:11","modified_gmt":"2021-07-09T22:31:11","slug":"cgn-mines-fenix-montufar","status":"publish","type":"avada_portfolio","link":"https:\/\/www.rodiosbo.com\/en\/offer-portfolio\/cgn-mines-fenix-montufar\/","title":{"rendered":"CGN Mines (F\u00e9nix, Mont\u00fafar)"},"content":{"rendered":"
Mining exploration with core recovery at Mina CGN was carried out by means of tricone and mud drilling, in addition to diamond drilling to achieve depths of up to 50 meters.<\/span><\/p>\n<\/div> Drilling of a series of vertical and inclined boreholes were carried out at depths of up to 50 meters, for a total of 7,000 lm, whose diamond drilling was carried out with the proposed diameter of HQ-3 and crushing bits or tricones for rock cutting, considering the extraction of some cores by drilling. The basic sludge program consisted of the implementation of liquid or granular organic polymers, and\/or bentonite, as well as special additives for loss of circulation and clay dispersion.<\/span><\/p>\n<\/div><\/div><\/div> Client:<\/span> Country:<\/span><\/span><\/span> <\/b><\/p>\n Guatemala<\/span><\/b><\/p>\n<\/div> Start Date:<\/span><\/b><\/p>\n May 2013 (Mont\u00fafar)<\/span><\/b><\/p>\n April 2017 (F\u00e9nix)<\/span><\/b><\/p>\n End Date:<\/span><\/span><\/b><\/span><\/p>\n October 2013 (Mont\u00fafar)<\/span><\/span><\/b><\/p>\n November 2018 (F\u00e9nix)<\/span><\/b><\/p>\n<\/div> Amounts of work: <\/span><\/span>
\nCompa\u00f1\u00eda Guatemalteca de N\u00edquel, S.A.<\/span><\/b><\/p>\n<\/div>
\nMore than 7,000 ml of drilling.<\/span><\/span><\/span><\/b><\/p>\n<\/div><\/div><\/div>