{"id":9187,"date":"2021-07-07T23:17:43","date_gmt":"2021-07-07T21:17:43","guid":{"rendered":"https:\/\/www.rodiosbo.com\/?post_type=avada_portfolio&p=9187"},"modified":"2021-07-10T00:23:21","modified_gmt":"2021-07-09T22:23:21","slug":"oxec-hydroelectric-power-plant","status":"publish","type":"avada_portfolio","link":"https:\/\/www.rodiosbo.com\/en\/offer-portfolio\/oxec-hydroelectric-power-plant\/","title":{"rendered":"Oxec Hydroelectric Power Plant"},"content":{"rendered":"

Project Description<\/span><\/strong><\/div><\/h2><\/div>

The protection of slopes of the Oxec Hydroelectric powerhouse was characterized by using the Soil Nailing and Shotcrete type walls as treatment, in addition drains were added due to the conditions of the terrain.<\/span><\/p>\n<\/div>

<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>

Solution<\/span><\/strong><\/div><\/h2><\/div>

Due to the terrain conditions, a Soil Nailing and Shotcrete Wall was built. In addition, due to the characteristics of the project, structural scaffolding and portable drilling equipment were used.. <\/span><\/p>\n<\/div><\/div><\/div>

<\/div><\/div><\/div>

Client:<\/b><\/span>
\nSolel Boneh<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Country:<\/span><\/span><\/span> <\/b><\/p>\n

Guatemala<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Start Date:<\/span><\/b><\/p>\n

August 2015<\/span><\/b><\/p>\n

End Date:<\/span><\/span><\/b><\/span><\/p>\n

December 2015<\/span><\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Amounts of work: <\/span><\/b><\/span>
\n3,330 m<\/span><\/span>2<\/span><\/span><\/sup> of Soil Nailing.<\/span><\/span><\/span><\/b><\/p>\n

7,874 m<\/span><\/span>2<\/span><\/span><\/sup> of Shotcrete.<\/span><\/span><\/span><\/b><\/p>\n

2,592 lm<\/span><\/span>\u00a0of Subhorizontal Drains.<\/span><\/span><\/span><\/b><\/p>\n<\/div><\/div><\/div>