{"id":9186,"date":"2021-07-07T23:17:38","date_gmt":"2021-07-07T21:17:38","guid":{"rendered":"https:\/\/www.rodiosbo.com\/?post_type=avada_portfolio&p=9186"},"modified":"2021-07-10T00:22:39","modified_gmt":"2021-07-09T22:22:39","slug":"lng-aes-colon-plant-phase-i-and-ii","status":"publish","type":"avada_portfolio","link":"https:\/\/www.rodiosbo.com\/en\/offer-portfolio\/lng-aes-colon-plant-phase-i-and-ii\/","title":{"rendered":"LNG AES Col\u00f3n Plant (Phase I and II)"},"content":{"rendered":"
The Korean company POSCO E&C was awarded the EPC contract for the construction of the LNG Power Plant and Terminal located on Telfer Island, Col\u00f3n, Panama. The terminal will supply natural gas to the future 380MW power plant.<\/span><\/p>\n As part of the project, the two main areas of the terminal were designed and built:<\/span><\/p>\n 1. LNG Deposits and LNG Facilities Area.<\/span><\/p>\n 2. Power Plant Installations including three Power Islands \/ Turbines<\/span><\/p>\n .<\/span><\/p>\n<\/div> To meet the needs of our client, the project was executed in two phases. The first consisted of driven piles and the second consisted of soil improvement with the stone column technique..<\/span><\/p>\n<\/div><\/div><\/div> Client:<\/b><\/span> Country:<\/span><\/span><\/span> <\/b><\/p>\n Panama<\/span><\/b><\/p>\n<\/div> Start Date:<\/span><\/b><\/p>\n June 2016<\/span><\/b><\/p>\n End Date:<\/span><\/span><\/b><\/span><\/p>\n May 2017<\/span><\/span><\/b><\/p>\n<\/div> Amounts of work: <\/span><\/b><\/span> 123,000 lm of 900mm diameter Stone Columns (Wet and Dry).<\/span><\/span><\/span><\/b><\/p>\n<\/div><\/div><\/div>
\nPosco E&C<\/span><\/b><\/p>\n<\/div>
\n29,379 lm of Driven Piles.<\/span><\/span><\/span><\/b><\/p>\n