{"id":9184,"date":"2021-07-07T23:17:29","date_gmt":"2021-07-07T21:17:29","guid":{"rendered":"https:\/\/www.rodiosbo.com\/?post_type=avada_portfolio&p=9184"},"modified":"2022-06-10T16:47:55","modified_gmt":"2022-06-10T14:47:55","slug":"las-chinamas-landslide","status":"publish","type":"avada_portfolio","link":"https:\/\/www.rodiosbo.com\/en\/offer-portfolio\/las-chinamas-landslide\/","title":{"rendered":"Las Chinamas Landslide"},"content":{"rendered":"
The Chinamas landslide is characterized by the use of Active Anchors to stabilize the landslide and a micropile screen was added in the area of greatest instability..<\/span><\/p>\n<\/div> Due to the existing conditions, it was necessary to execute active anchors, up to 35.0m, being used for the first time in El Salvador, the ODEX system, which allows a temporary casing throughout the entire length of the hole. In addition, it was necessary to build a micropile screen to stabilize the most critical area of the slope.. <\/span><\/p>\n<\/div><\/div><\/div> Client:<\/b><\/span> Country:<\/span><\/span><\/span> <\/b><\/p>\n El Salvador<\/span><\/b><\/p>\n<\/div> Start Date:<\/span><\/b><\/p>\n November 2012<\/span><\/b><\/p>\n End Date:<\/span><\/span><\/b><\/span><\/p>\n September 2013<\/span><\/span><\/b><\/p>\n<\/div> Amounts of work: <\/span><\/b><\/span>
\nFOVIAL<\/span><\/b><\/p>\n<\/div>
\n1,227 m<\/span><\/span>2<\/span><\/span><\/sup> of Achored Wall and 191 m2<\/span><\/sup> of Soil Nailing.<\/span><\/span><\/span><\/b><\/p>\n<\/div><\/div><\/div>