{"id":9183,"date":"2021-07-07T23:17:24","date_gmt":"2021-07-07T21:17:24","guid":{"rendered":"https:\/\/www.rodiosbo.com\/?post_type=avada_portfolio&p=9183"},"modified":"2021-07-09T02:25:09","modified_gmt":"2021-07-09T00:25:09","slug":"guardia-de-honor-road-exchanger","status":"publish","type":"avada_portfolio","link":"https:\/\/www.rodiosbo.com\/en\/offer-portfolio\/guardia-de-honor-road-exchanger\/","title":{"rendered":"Guardia de Honor Road Exchanger"},"content":{"rendered":"
The Guardia de Honor Overpass represents a road solution to reduce traffic in zone 10 of Guatemala City. <\/span><\/p>\n<\/div> For the construction of the road exchanger, pile walls of 500mm and 750mm were executed with a depth of up to 16.00 meters. The structure consists of three bridges made up of: head beam, cross beams and slab. At the entrance and exit of the project, it was protected by Soil Nailing and, in addition, to control the rainwater, a system of drains connected by manholes was made..<\/span><\/p>\n<\/div><\/div><\/div> Client:<\/b><\/span> Country:<\/span><\/span><\/span> <\/b><\/p>\n Guatemala<\/span><\/b><\/p>\n<\/div> Start Date:<\/span><\/b><\/p>\n December 2015<\/span><\/b><\/p>\n End Date:<\/span><\/span><\/b><\/span><\/p>\n May 2016<\/span><\/span><\/b><\/p>\n<\/div> Amounts of work: <\/span><\/b><\/span>
\nMunicipalidad de Guatemala<\/span><\/b><\/p>\n<\/div>
\n2,482 m<\/span><\/span>2<\/span><\/span><\/sup> of Soil Nailing and 1,024 ml of Rotary Piles.<\/span><\/span><\/span><\/b><\/p>\n<\/div><\/div><\/div>