{"id":9143,"date":"2021-07-07T23:10:28","date_gmt":"2021-07-07T21:10:28","guid":{"rendered":"https:\/\/www.rodiosbo.com\/?post_type=avada_portfolio&p=9143"},"modified":"2021-07-09T23:59:56","modified_gmt":"2021-07-09T21:59:56","slug":"civic-government-center-in-tegucigalpa","status":"publish","type":"avada_portfolio","link":"https:\/\/www.rodiosbo.com\/en\/offer-portfolio\/civic-government-center-in-tegucigalpa\/","title":{"rendered":"Civic Government Center in Tegucigalpa"},"content":{"rendered":"

Project Description<\/span><\/strong><\/h2><\/div>

The Tegucigalpa Government Civic Center project is a Public Building project that will connect 40 government agencies. The building has 24 upper levels and due to the geotechnical conditions of the area; the foundation of the project was made using foundation piles.<\/span><\/p>\n<\/div>

<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>

Solution<\/span><\/strong><\/p><\/h2><\/div>

The foundation of the project consisted of piles ranging from 700mm to 1400mm in diameter. Their maximum depth was up to 20 meters. The drilling system used was “Rotary” type; due to the geotechnical conditions of the project and the presence of a water table, it was necessary to use a recoverable temporary casing in the first meters of the drilling..<\/p>\n<\/div><\/div><\/div>

<\/div><\/div><\/div>

Client: <\/b><\/span>
\nGIA<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Country: <\/b><\/span>
\n<\/b>Honduras<\/b><\/span><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Start Date: <\/b><\/span>
\n<\/b>January 2017<\/b><\/span><\/p>\n

End Date: <\/b><\/span>
\nJune 2017<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Amounts of Work:<\/span><\/b><\/span>
\n<\/b><\/p>\n