Project Description
The original design of the expansion of the Juan Díaz WWTP consisted of a deep foundation using rotary piles of 600 mm diameter and from 20 to 27 meters deep, in a predominantly organic clay soil (lama) and with an embedment in weathered rock of 5 to 7 meters.
Solution
Rodio Swissboring proposed a foundation solution based on CFA piles for the project, to achieve an improvement in execution times and costs.
Client:
Suez
Country:
Panama
Start Date:
June 2018
End Date:
October 2018
Amounts of work:
22,386 ml of 600mm CFA Piles.
3,963 ml of 600mm Rotary Piles.