Project Description

The protection of slopes of the Oxec Hydroelectric powerhouse was characterized by using the Soil Nailing and Shotcrete type walls as treatment, in addition drains were added due to the conditions of the terrain.

Solution

Due to the terrain conditions, a Soil Nailing and Shotcrete Wall was built. In addition, due to the characteristics of the project, structural scaffolding and portable drilling equipment were used..

Client:
Solel Boneh

Country:

Guatemala

Start Date:

August 2015

End Date:

December 2015

Amounts of work:
3,330 m2 of Soil Nailing.

7,874 m2 of Shotcrete.

2,592 lm of Subhorizontal Drains.