Project Description
The project consists of an apartment complex called “Ecovivienda”, developed with an environmentally friendly vision and in which it seeks to have housing with high standards.
Solution
The excavation slopes were stabilized with anchor walls and Soil Nailing. This solution was proposed with the aim of meeting the demanding execution times required by the project.
Client:
Ecoproyectos
Country:
Honduras
Start Date:
Octuber 2021
End Date:
December 2021
Amounts of Work:
1,955 m2 of Anchored Walls and Soil Nailing.