Project Description

The Overpass is an important improvement in the flow of vehicular traffic at the entrance to the Municipality of Santa Catarina Pinula, where the greatest challenge was the construction process due to the great limitations of space for the construction of the project.

Solution

The Project consisted of the construction of a road interchange with 3 levels, almost 500 meters long and two bridges with up to 16 meters of free span between supports. The slopes were stabilized with Soil Nailing and Cast-in-place Piles. The geometric design was provided by Rodio Swissboring as part of the customer service and support.

Client:
Municipalidad de Santa Catarina Pinula

Country:

Guatemala

Start Date:

April 2021

End Date:

Octuber 2021

Amounts of Work:
1,860 m2 of Soil Nailing.

1,260 ml of Boring Piles.

13,000 m3 of Earthworks.

3,000 m2 of Rigid Pavement.

Related Projects

Do you have a project?

We can assist you and guarantee the best result.

Rodio Swissboring - Trabaja con nosotros

Do you have a project?

We can assist you and guarantee the best result.

Rodio Swissboring - Trabaja con nosotros