Project Description

The project consisted in the construction of cast-in place piles for the structure of two bridges that will form part of a By Pass located in one of the main areas of eastern El Salvador. The first bridge called Taisihuat consisted of 22 foundation piles, while the second bridge called Río Grande has 32 foundation piles.

Solution

Due to the conditions of the project (water level and ground conditions), the piles were executed using a temporary casing system and the use of polymers to guarantee the integrity of the drilling during the construction process. In addition, Cross Hole and Dynamic Load tests were carried out to evaluate the quality and integrity of the piles.

Client:
Constructora Meco

Country:

El Salvador

Start Date:

November 2021

End Date:

February 2022

Amounts of Work:
950 ml of 1,500 mm diameter piles.

245 ml of 1,200 mm diameter piles.

75 ml of 600 mm diameter piles.

Related Projects

Do you have a project?

We can assist you and guarantee the best result.

Rodio Swissboring - Trabaja con nosotros

Do you have a project?

We can assist you and guarantee the best result.

Rodio Swissboring - Trabaja con nosotros