Project Description

The ALANZA Group commissioned Rodio Swissboring to build its new dock for the export of stone aggregates located in the most important port of Honduras, Puerto Cortés. For this, a design conceived by some of the world’s leading dock design firms, WSP USA inc., which was executed with the highest quality standards for the dock branch, was brought to life.

 

Solution

The construction of the Agrecasa pier was carried out by driving 102 piles of 914mm in diameter. These had a maximum depth of 40 meters, since they had to transmit the load of the structures to competent ground strata. To ensure that all the piles had the necessary strength to withstand the design loads, numerous pile load tests were carried out, analyzing results and obtaining capacities greater than 400 tons of load per pile.

Client:
Avanza

Country:
Honduras

Start Date:
June 2019

End Date:
January 2020

Amounts of Work:

  • 3,640 ml of Driven Piles 914mm of diameter.
  • 4,500m3 of concrete in precast elements.
  • 1,230m3 of cast in place concrete, 240 tons of steel.

Related Projects

Do you have a project?

We can assist you and guarantee the best result.

Rodio Swissboring - Trabaja con nosotros

Do you have a project?

We can assist you and guarantee the best result.

Rodio Swissboring - Trabaja con nosotros