Project Description

The overpass is an important improvement in the flow of vehicular traffic near the new Spazio Mall. It consists of three main axes: Axis 1 – Main street from zone 15 towards Ciudad Cayalá; Axis 2 – Access lane to Spazio Mall; Axis 3 – Elevated lane with slab and controlled fill from Universidad del Valle de Guatemala to zone 15.

Solution

The Project consisted of the construction of a road interchange that allows the free flow of traffic on the main boulevard. The main objective was to carry out the project without distrubing the traffic. The use of precast slabs for the main bridge was key for the construction methodology to be carried out efficiently.

Client:
Terrum

Country:

Guatemala

Start Date:

June 2020

End Date:

November 2020

Amounts of Work:
6,320 m3 of Controlled Fill.

6,315 m3 of Earthwork.

100 m2 of Slab.

Related Projects

Do you have a project?

We can assist you and guarantee the best result.

Rodio Swissboring - Trabaja con nosotros

Do you have a project?

We can assist you and guarantee the best result.

Rodio Swissboring - Trabaja con nosotros