Project Description

The Korean company POSCO E&C was awarded the EPC contract for the construction of the LNG Power Plant and Terminal located on Telfer Island, Colón, Panama. The terminal will supply natural gas to the future 380MW power plant.

As part of the project, the two main areas of the terminal were designed and built:

1. LNG Deposits and LNG Facilities Area.

2. Power Plant Installations including three Power Islands / Turbines

.

Solution

To meet the needs of our client, the project was executed in two phases. The first consisted of driven piles and the second consisted of soil improvement with the stone column technique..

Client:
Posco E&C

Country:

Panama

Start Date:

June 2016

End Date:

May 2017

Amounts of work:
29,379 lm of Driven Piles.

123,000 lm of 900mm diameter Stone Columns (Wet and Dry).

Related Projects

Do you have a project?

We can assist you and guarantee the best result.

Rodio Swissboring - Trabaja con nosotros

Do you have a project?

We can assist you and guarantee the best result.

Rodio Swissboring - Trabaja con nosotros